Output growth for equipment and crews on construction sites and in quarries
One product with four interfaces — operator, foreman, dispatcher, executive. Manages the full shift loop: plan → norm → fact → deviation → decision → bonus. Turns a fragmented fleet into a managed production asset.
Full shift loop: plan → norm → fact → deviation → decision → bonus
Four roles — one product. Motivation is calculated automatically from actual output — no manual spreadsheets, no disputes.
Operator
Task, route and norm in a mobile app; actual output captured automatically without paper tickets.
Foreman / Acceptor
Colour-coded site map by output, confirmation of volumes, quick issue capture.
Dispatcher
Real-time fleet load, redistribution of equipment between crews and shifts.
Executive
Output dashboard, deviations, downtime forecast and AI-agent recommendations.
Motivation loop
Shift bonuses are calculated automatically from actual output — transparent model, no manual spreadsheets.
Measured effect
+11–23 pp output growth · −11–30 pp downtime — measured on federal-level construction sites.
Industrial product from four components
Methodology + training + software + analytics. Turn-key deployment: 7 days technically, 90 days to business effect.
Methodology
An industry model of output management, tested on federal-level construction. Regulations for managing heavy equipment across the full asset lifecycle; anchored to MDS / GESN norms and the company's financials.
Training
A programme for line personnel: using the system plus managing deviations and motivation.
Software
Four connected interfaces plus a backend in the client's environment — cloud or on-premise.
Analytics
Downtime forecasts, plan-vs-fact, an AI agent and a voice assistant. Retains the effect after the initial deployment.
Industrial deployment and pilots
1,000+ machines
Under BIS-ON management on a federal-scale construction project.
3,000+ trained employees
Operators, foremen, dispatchers and executives trained on the platform.
4 commercial pilots
Ongoing — CIS and North Africa.
+15% utilisation
Confirmed within 30 days — coefficient of equipment usage.
Mixed fleet · 7 days to deployment · automatic motivation on every shift
| Competitor | Architecture | Weakness in the region |
|---|---|---|
| Komatsu Smart Quarry (JP) | Cloud + OEM lock-in | Only premium CAN-bus fleet · 6–9 months |
| Trimble Connected (US) | Cloud | Premium licence · long deployment cycle |
| Hexagon Mining (SE) | Cloud + OT | Price and length of deployment |
| Local integrators | — | Only tracking and fuel · no output or motivation |
| Local startups | — | Narrow product — one function only |
CIS market is fragmented — telematics is common, output and motivation are a white space. KSA / UAE is an oligopoly of premium vendors with OEM lock-in. North Africa is served by narrow trackers. BIS-ON operates on a mixed fleet, deploys in 7 days and automates motivation from the first shift.
Licence per machine · one-time onboarding · measurable effect on the fleet
| Line | Scope | Investment | Client effect |
|---|---|---|---|
| Licence | Per machine, per year | $1.2 – 2.0K | Full platform access, all four roles |
| Onboarding | One-time, per site | $50 – 150K | Methodology, training, model calibration |
| Effect on a 100-machine fleet | Annual, at <$300K total investment | $2.5 – 5M | Additional profit — measured, not projected |
Ready to see SAQR on your asset?
Book a 30-minute walkthrough with our team. We will show live demos on assets similar to yours and outline a pilot plan.